Building Regulations for a house extension

Planning permission decides whether you can build; Building Regulations decide how. Almost every extension needs Building Regulations approval, even when it doesn't need planning permission. Here's what's involved in England.

Make my building regs drawings free

Full plans or building notice?

You can use your council's Building Control or a registered private Building Control approver. Either way the work is inspected at stages: foundations, damp-proof course, drainage, structure and completion.

Insulation: Part L U-values

New parts of an extension must meet these limiting U-values (W/m²K, Part L 2021). The lower the number, the better the insulation.

ElementLimitTypical build-up
External walls0.18Brick and block cavity wall with 150 mm full-fill mineral wool
Pitched roof0.15About 300 mm of mineral wool at ceiling level, or PIR between and under rafters
Flat roof0.15Warm deck with about 140 mm PIR
Ground floor0.18Concrete slab with about 100 mm PIR (depends on the floor's shape)
Windows and doors1.4Double glazing, low-E glass, argon filled
Rooflights2.2

Glazing is limited to 25% of the extension's floor area, plus the area of any windows or doors the extension removes, unless you show compliance another way.

The other parts that usually apply

PartWhat it means for an extension
A — StructureFoundations, beams, lintels and roof members designed to carry their loads. Steel beams over new openings need a structural engineer's calculations.
B — FireMains-powered, interlinked smoke alarms; escape windows from first-floor habitable rooms; fire resistance near boundaries.
C — Moisture and radonA damp-proof course and membrane, and radon protection where the UKradon map shows it is needed.
F — VentilationExtract fans in kitchens and bathrooms, trickle vents in windows, and opening windows for purge ventilation.
G and JHot water safety, and safe flues for boilers and stoves near the new walls and windows.
H — DrainageNew drains and rainwater, and building over or near existing drains.
K, M and QSafety glass, access that is no worse than before, and secure doors and windows.
P — ElectricsElectrical work by a registered competent person, with a certificate.

Other things to arrange

Make the drawings for free

Extension Plans draws 1:50 sections through each extension, annotated floor plans with alarms, fans, steels and escape windows, and a full specification, with the insulation sized to pass Part L. Upload your floor plan and the house is built for you.

Start now
A guide only. Building Control will need the drawings checked and completed by a professional, and a structural engineer's calculations. The specification follows the Approved Documents for England; check they are current.